Proper seasonal maintenance extends your cooler's lifespan and ensures efficient operation. Here's a comprehensive checklist:
SPRING STARTUP CHECKLIST
Before the first hot day, complete these steps:
1. Inspect and clean
- Remove the cooler cover (if installed)
- Clean out any debris, leaves, or animal nests
- Vacuum or brush out the interior
- Scrub the water reservoir/pan
2. Check and replace pads
- Inspect pads for deterioration, mineral buildup, or mold
- Replace aspen pads annually; check rigid pads for damage
- Ensure pads are properly seated with no gaps
3. Water system
- Reconnect the water supply line
- Check the float valve—it should shut off when reservoir is full
- Inspect and clean the pump and intake screen
- Clear any clogs in water distribution tubes
- Turn on water and check for leaks
4. Mechanical components
- Inspect the belt (if belt-driven) for cracks or wear
- Check belt tension—should deflect about 1 inch when pressed
- Lubricate motor bearings if equipped with oil ports
- Verify the motor runs smoothly without unusual noise
5. Test operation
- Run pump only first—verify water flows evenly over all pads
- Run fan only—check for vibration or noise
- Run both together and verify cooling
---
FALL SHUTDOWN CHECKLIST
Before freezing weather arrives:
1. Drain completely
- Turn off water supply
- Drain the reservoir completely
- Open any drain plugs
- Run the pump briefly to clear water lines
2. Disconnect water
- Disconnect the water supply line
- Store the line inside if possible
- Cap the connection point
3. Protect from winter
- Close the damper (if equipped) to prevent cold air infiltration
- Install a cooler cover to keep out debris and moisture
- For window units, consider removing and storing indoors
4. Optional professional service
- Have a technician inspect before storage
- Address any needed repairs before spring